Illustrative renovation study

A smaller, calmer room

A 9 m² bathroom scenario organised around a wet zone, a dry ledge and useful storage.

Area
9 m² · conceptual
Property
Apartment
Setting
Ancoats · illustrative
Status
Not a completed commission
Spatial reference — a restrained bathroom palette. Licensed reference, not the fictional project.
01 / Spatial reference — a restrained bathroom palette. Licensed reference image; not Morrow Span work.
01 / The brief

What this study explores.

This invented bathroom explores a limited palette and a clear division between wet and dry uses. The study considers reachable storage, cleaning access and where small objects land, before choosing fittings.

Constraints, stated early

  • Drainage, ventilation and waterproofing require qualified assessment; none is designed here.
  • The illustration does not certify access clearances or regulatory compliance.
  • This room is below the estimator’s 10 m² minimum; the area must not be silently increased.
02 / Drawing study

A plan to discuss.

Authored conceptual diagram. Not surveyed, not to scale and not for construction. No structural suitability is implied.

Concept plan with labelled zones: Wet zone, Basin, Storage, Dry route. Existing structure and all dimensions are unverified.
03 / Materials & decisions

From the room
to the junction.

01The wet zone is contained in the conceptual far end. A continuous dry ledge gives everyday items a clear home.

02Large quiet surfaces reduce visual interruptions. Tile joints align with the ledge where the survey permits.

03A pale palette reflects daylight. A separate task-light position is suggested at the mirror, without an electrical design.

Conceptual specification register

T03Matte porcelainWet-area suitability to be verified
J03Moisture-resistant vanityFinish and substrate to be specified
M03Plain mirrorEdges and fixing by supplier
S03Neutral solid surfaceSample ledge; sealed junctions
04 / Scope boundary

Included in the discussion.

  • Fixture arrangement concept
  • Wet/dry material boundaries
  • Mirror, ledge and storage discussion
  • Tile set-out intentions

Outside this study

Waterproofing design, plumbing changes, ventilation sizing, compliance checks and structural work are excluded.

Read the related scope →

At 9 m², this study is below the budget worksheet’s 10 m² minimum. Send a scope enquiry without an estimate.

Start a sample enquiry ↗